--- title: "Control Library" slug: "05-control-library" updated: 2026-07-03T08:18:30Z published: 2026-07-03T08:18:30Z canonical: "docs.safran.com/05-control-library" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # 05-control-library # Control Library **Version:** V26.0 (Beta) **Back to:** [Index](/v1/docs/00-index) --- ## Overview The Control Library is a central repository of pre-defined risk controls and mitigation measures that can be applied to risks across all projects. Maintaining a Control Library ensures consistency in how controls are described and prioritised throughout the organisation. ![control-library](https://cdn.document360.io/50ded092-9d8c-4eb9-8e6f-51ce28d62ac8/Images/Documentation/control-library.png) --- ## Control Library List All existing controls are displayed in a filterable table. Use the **Contains...** filter fields at the top of each column to search within the list. | Column | Description | | --- | --- | | Domain Name | The risk domain or area the control belongs to (e.g. Financial Crime, IT Security) | | Control Name | The name of the specific control measure | | Specification Name | A description of the specification or standard the control is based on | | Priority Value | A numeric priority value indicating the importance or urgency of the control | | Control Library Notes | Additional notes or context about the control | **Example controls include:** | Domain | Control | Specification | Priority | | --- | --- | --- | --- | | Financial Crime | Three Way match | Three Way Match | 1 | | IT Security | Vulnerability Scanning | Out of date software monitoring | 5 | --- ## Adding a New Control 1. Click **Add new** (top right). 2. Complete the control form: | Field | Description | | --- | --- | | Domain Name | The domain the control applies to | | Domain ID | The unique ID for this domain | | Domain Description | The description for the control domain | | Control Name | A short, descriptive name for the control | | Control ID | The unique ID for this control | | Control Description | The description for the control | | Specification Name | The specification, standard or process the control is based on | | Priority Value | A numeric value — lower numbers typically indicate higher priority | | Control Library Notes | Optional free-text notes for additional context | 1. Click **Save**. ![add-control-library](https://cdn.document360.io/50ded092-9d8c-4eb9-8e6f-51ce28d62ac8/Images/Documentation/add-control-library.png) --- ## Editing a Control 1. Click the **edit (pencil)** icon in the Action column next to the control. 2. Update the required fields. 3. Click **Save**. --- ## Deleting a Control 1. Click the **delete (bin)** icon in the Action column next to the control. 2. Confirm the deletion. > **Note:** Controls that are already linked to risks in project risk registers should not be deleted without first reviewing those links. --- ## Using Controls in Projects Project users can reference the Control Library when defining treatment actions for risks, selecting controls directly from the pre-defined library. This promotes standardisation and allows the organisation to track which controls are being applied across projects. --- **Next:** [06-kri](/v1/docs/06-kri) **Previous:** [06-kri](/v1/docs/06-kri) **Back to:**[00-Index](/v1/docs/00-index)