--- title: "DRU Tables" slug: "safran-data-reporting-utility-dru-tables" description: "A list of the database tables used by the Data Reporting Utility." tags: ["DRU tables", "DRU", "Data Reporting Utility", "Database"] updated: 2025-01-28T11:15:41Z published: 2025-01-28T11:15:41Z canonical: "docs.safran.com/safran-data-reporting-utility-dru-tables" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # DRU Tables ### DRU tables | TABLE | DESCRIPTION | | --- | --- | | dru_dataset_values | Data for each job and dataset, containing the dimensions (short), period start, period finish, period value, cumulative value and manpower value | | dru_group_definitions | Data for each job, containing the dimension number (order), short and description | | dru_group_values | Data for each job, containing the dimensions (short) | | dru_job_datasets | Data for each job and dataset, containing the dataset setup | | dru_job_groups | Data for each job, containing the dimension number, dimension field and outline code level | | dru_jobs | Data for each job, containing job setup | | dru_periods | Data for each job, containing the job periods | | dru_sys_preferences | A table containing the default next-run method | | dru_sys_schedules | A table containing the system schedules | | dru_sys_scopes | A table containing the system scopes |