--- title: "Preferences" slug: "safran-data-reporting-utility-preferences" description: "Using the preference tab to configure the rules used to calculate the next run time." tags: ["Preferences tab", "Run Method", "configuratation", "DRU", "Data Reporting Utility"] updated: 2025-01-28T11:46:22Z published: 2025-01-28T11:46:22Z canonical: "docs.safran.com/safran-data-reporting-utility-preferences" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Preferences ### Preferences In the Preferences tab, the Default Next Run Method can be set—the default next run method will be used as the next run method for new jobs. The value can be changed for each job. ![The Preference Tab of the Data Reporting Utility.](https://cdn.document360.io/50ded092-9d8c-4eb9-8e6f-51ce28d62ac8/Images/Documentation/Safran%20DRU%20Preferences%20Tab.png) Pure frequency is used for a fixed interval between the job execution. The last run started is used to have the job's start time calculate the next run. The last run ended is used to have the end time of the job calculate the next run.