--- title: "Activity Links" slug: "safran-project-integration-api-activity-links" updated: 2026-01-30T07:41:17Z published: 2026-01-30T07:41:17Z canonical: "docs.safran.com/safran-project-integration-api-activity-links" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Activity Links ## Activity Links ### /v1/activity_links/ List Of Relationships for Activities ### Example for calling: http://server/v1/activity_links - retrieves all activity_links http://server/v1/activity_links?network_id=1 – retrieves activity_links for activities in network having id = 1 ### Allowed Methods: [GET] API Controller: **activity_links** ### Description: 1. Lists all activity links for the supplied network_id. 2. Activity links referring to non-existing activities will not be included in the result set from the API. 3. Activity links referring to non-existing calendars will have no calendar in the result set from the API. Activity link will be listed but without calendar. **Parameters:** | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | network_id | integer | Network Id | Returns constraints related to given network id.If "SafranWebAPIOwnerVerificationDuringApiCalls" in [Application Settings](/v1/docs/application-settings) is in use, this is mandatory | | owner | string | Networks owner | [Optional] Relates to "SafranWebAPIOwnerVerificationDuringApiCalls" in [Application Settings](/v1/docs/application-settings) | ### Response Fields: | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | prev_id | integer | Id for preceding activity | | | next_id | integer | Id for succeeding activity | | | network_id | integer | Network Id | | | link_type | integer | Link type (possible values: FS, SF, FF, SS) | SS = 1 SF = 2 FS = 3 FF = 4 | | lag_time | integer | Lag time on activity link | | | calendar | integer | Activity link calendar | | | duration_format | string | Formating unit for the lag_time field | "weeks" "days" "hours" "minutes" "percent" "undefined" - meaning database value is null or 0 | | disabled | boolean | A field both in the Predecessors and Successors area of Logic Navigator and Links Panels, which allows to disable Links so they do not have an effect in the Activities linked | Default value is False | **Show JSON Response** json result ``` [ { "prev_id": 1, "next_id": 10, "network_id": 1, "link_type": 3, "prev_name": "00010", "next_name": "CSNew001" }, { "prev_id": 10, "next_id": 12, "network_id": 1, "link_type": 4, "prev_name": "CSNew001", "next_name": "CSNew002" }, { "prev_id": 12, "next_id": 14, "network_id": 1, "link_type": 1, "prev_name": "CSNew002", "next_name": "CSNew004" }, { "prev_id": 15, "next_id": 14, "network_id": 1, "link_type": 4, "lag_time": 3, "calendar": 1, "prev_name": "CSNew005", "next_name": "CSNew004", "duration_format": "days" } ] ```