--- title: "API Methods" slug: "safran-project-integration-api-api-methods" updated: 2026-06-22T13:29:15Z published: 2026-06-23T07:05:54Z canonical: "docs.safran.com/safran-project-integration-api-api-methods" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # API Methods ## API Methods The API provides GET, POST and PATCH methods. The following API endpoints/methods are available through the Safran Integration API. ### GET The API provides the following GET methods: 1. **project_preview** 1. In Safran Project 5, Projects and Networks were distinct entities. This call returns a list of the relationships between networks and projects. 2. **projects** 1. Gets a list of all projects. 3. **projectscopeconfiguration** 1. Retrieves one or more projects scope configuration details. 4. **cutoff** 1. Retrieves one or more projects cutoff details 5. **activities** 1. Gets a list of all activities. 2. This call should be considered using parameters avoiding a large result set. 3. Usually the Network Id will be the same as the Project Id 4. Since the activity Id is not Unique with the table, this call may result in several activities being returned which have the same Id but belong to different projects. 6. **activity_links** 1. Gets a list of all activity_links. 7. **calendarset** 1. Get list of Calendar set 8. **codesets** 1. Gets a list of all codesets 9. **changeorder** 1. Get list of Change order register 10. **resources** 1. Gets a List Of Resource Definitions 11. **resourceset** 1. Gets List Of Resource Sets 12. **version** 1. Gets a list of version info describing the API and the Safran ### POST The API provides the following POST methods: 1. **activities** 1. Create, update or delete Activities 2. **activity_links** 1. Maintain (create/delete) Relationships for Activities 3. **resources** 1. Create Resources. ### PATCH The API provides the following PATCH methods: 1. **activities** 1. Update single activity with the details provided, all other details remains as is. 2. **codeset** 1. Update the single codeset with the details provided; all other details remain as is. ### Update Behavior (POST vs PATCH) The API supports both full and partial updates. It is important to understand the difference to avoid unintended data loss. #### POST (Create / Full Update) The POST endpoint is used for both creating and updating records. When used for updates (action = "update"), the request performs a **full replacement** of the resource: - All fields must be provided in the request body - Any fields **not included** will be **cleared or reset** - The existing record is effectively replaced with the submitted payload #### PATCH (Partial Update) The PATCH endpoint should be used for partial updates: - Only the fields included in the request are updated - All other fields remain unchanged ### Recommendation - Use PATCH for most updates (safe, partial updates) - Use POST (update) only when you intend to replace the entire record