--- title: "Change Order" slug: "safran-project-integration-api-change-order" updated: 2024-07-18T08:57:56Z published: 2024-07-18T08:57:56Z canonical: "docs.safran.com/safran-project-integration-api-change-order" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Change Order ## Change order register ### /v1/changeorder Change order register ### Example for calling: http://server/v1/changeorder?network_id=9 - retrieves all change orders related to the network with network id = 9 http://server/v1/changeorder?network_id=9&id=1 - retrieves change orders with id = 1 for network with network id = 9 ### Allowed Methods: [GET] API Controller: **Changeorder** ### Description: Retrieves the change order details for specific networks. all network-related change orders if no ID is specified. The caller must specify network ID. ### Parameters: | Name | Type | Description | Note | | --- | --- | --- | --- | | network_id | integer | Network Id related to the change orders | Mandatory | | id | integer | Change order ID | | | owner | string | Owner of the network | Related to "[SafranWebApiOwnerVerificationDuringApiCalls](/v1/docs/application-settings#application_settings_SafranWebAPIOwnerVerificationDuringApiCalls)" in "[Application Settings](/v1/docs/application-settings)" | - When "SafranWebApiOwnerVerificationDuringApiCalls" is in use, the owner is mandatory. ### Response Fields: | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | Seq | integer | Correspond to the ID in [Parameters](/v1/docs/changeorder#parameters) | | | ChangeOrder_Number | String | | | | Client_Number | String | | | | Revision | String | | | | Description | string | | | | Responsible | string | Person responsible for the change order | | | Issue_Date | Date time | Date when the change order was created/issued | | | Accepted_Date | Date time | Date for the acceptance of the change order | | | Remarks | string | | | | ChangeOrder_Type | string | Single character defining the change order type | V = variation order, R = variation order request, I = internal change, S = Subcontracted | | Net_Id | integer | Correspond to the network_id in [Parameters](/v1/docs/changeorder#parameters) | | **Sample JSON Response** ``` [ { "Seq": 1, "ChangeOrder_Number": "Change 001", "Client_Number": "Client A01", "Revision": "0", "Description": "This change is needed as per last agreement.", "Responsible": "SAFRANSA", "Issue_Date": "2020-07-08T00:00:00", "Remarks": "There are no remarks added to this change request.", "ChangeOrder_Type": "R", "Net_Id": 9 } ] ```