--- title: "Create Resources" slug: "safran-project-integration-api-create-resources" updated: 2026-01-30T07:45:58Z published: 2026-01-30T07:45:58Z canonical: "docs.safran.com/safran-project-integration-api-create-resources" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Create Resources ## Create resources ### /v1/resources Maintain Resources ### Example for calling: http://server/v1/resources See [Request Body](/v1/docs/create-resources#request-body) below. ### Allowed Methods: [POST] API Controller: **resources** ### Description: Resources can only be created . ### Request Fields: | Name | Type | Description | | --- | --- | --- | | RowId | integer | identifying a row in this request that lines up with the response | | name | Varchar(100) | Resource code/name | | description | Varchar(100) | Resource description [Optional] | | resource_set_id | integer | Relation to Resource set (this is not network id, but resource set id) | | resource_type | tinyint | Resource type (1=qty, 2=cost) | | cost_rate | float | Unit cost rate for resource type=1 [Optional] | | parent | integer | Used for hierarchical structure [Unused] | ### Response Fields: Table with response for each row in the request: | Name | Type | Description | Notes | | --- | --- | --- | --- | | RowId | integer | corresponds to the RowID in the request | | | Result | byte | S(uccess) or F(ail) indicating if the requested action was successfully executed | | | Message | string | Empty if success; error message if the requested action failed. | | | MessageId | integer | MessageId: Identifies error message | | | seq | integer | Safran Resource ID | | | name | string | Safran Resource name | | ### Request Body ``` [ { "RowID": 1, "name": "RD-0010", "description": "primary resource", "resource_set_id": 6, "resource_type": 1, "cost_rate": 1 }, { "RowID": 2, "name": "RD-0011", "description": "secondary resource", "resource_set_id": 5, "resource_type": 1, "cost_rate": 1 } ] ```