--- title: "Cutoff" slug: "safran-project-integration-api-cutoff" updated: 2026-01-30T07:40:26Z published: 2026-01-30T07:40:26Z canonical: "docs.safran.com/safran-project-integration-api-cutoff" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Cutoff ## Cutoff ### /v1/cutoff/{id} Retrieves one or more projects cutoff details. Regarding relation of network_id and project_id see project_previews for more details. ### Example for calling: http://server/v1/cutoff?id=1 - Retrieves cutoff details for project having project_id = 1 http://server/v1/cutoff?network_id=2 - Retrieves cutoff details for project having net_id = 2 http://server/v1/cutoff?item_guid=87de7975-097a-45b9-aaf8-51793e74cbdf - Retrieves cutoff details for network having guid = 87de7975-097a-45b9-aaf8-51793e74cbdf http://server/v1/cutoff?owner=SAFRAN - Retrieves cutoff details for project owned by user SAFRAN http://server/v1/cutoff?network_id=2&owner=SAFRAN - Retrieves cutoff details for project having net_id = 2 and owned by user SAFRAN http://server/v1/cutoff - Is not permitted. ### Allowed Methods: [GET] API Controller: **Cutoff** ### Description: Retrieves the cutoff details of a project for specified id, or all user owned projects when owner is specified. ### Request Fields : | Name | Type | Description | Notes | | --- | --- | --- | --- | | id | integer | Id of the project | Optional Returns cutoff details for provided project id | | network_id | integer | id of the related network | Optional Returns cutoff details for provided network id | | owner | string | Owner of the project | Relates to "SafranWebApiOwnerVerificationDuringApiCalls" in Application Settings | | item_guid | guid | guid of the network | Optional Returns cutoff details for provided guid | - When "SafranWebAPIOwnerVerificationDuringApiCalls" is in use, one of id or network_id is mandatory. - If ID, network_id and/or guid is passed to the API, all given values will be used. ### Response Fields: | Name | Type | Description | Notes | | --- | --- | --- | --- | | week_end | datetime | last cut off date for the project | | | project_id | integer | Unique ID of the project | | | net_id | integer | Unique network Id | | | LastUpdatedUTC | datetime | Date and time when details was updated | Time is in Coordinated Universal Time | **Sample JSON Response** json result ``` [ { "week_end": "2021-05-16T00:00:00", "project_id": 16, "net_id": 14, "LastUpdatedUTC": "2021-05-20T07:20:07.387" }, { "week_end": "2021-05-16T00:00:00", "project_id": 24, "net_id": 22, "LastUpdatedUTC": "2021-05-20T12:35:11.487" } ] ```