--- title: "JobGroupValues" slug: "safran-project-integration-api-job-group-values" updated: 2024-11-22T08:26:56Z published: 2024-11-22T08:26:56Z canonical: "docs.safran.com/safran-project-integration-api-job-group-values" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # JobGroupValues ## Job Group Values ### /v1/dru/jobgroupvalues/ The Data Reporting Utility enables users to define aggregation jobs and generate aggregated results. The job definitions and results are stored in your database and can be accessed through this API List Of Groups of the aggregated values from a Data Reporting Utility [Job](/v1/docs/jobs). ### Example for calling: http://server/v1/dru/jobgroupvalues?id=2 – retrieves values from the job with id 2 ### Allowed Methods: [GET] API Controller: **dru_jobresult** ### Description: 1. Retrieves groups of the aggregated results of a Job. **Parameters:** | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | id | integer | The ID of the Job | Mandatory | ### Response Fields: | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | job_id | integer | The ID of the Job | | | group1_short | string | The short value of group 1 | | | group2_short | string | The short value of group 2 | | | group3_short | string | The short value of group 3 | | | group4_short | string | The short value of group 4 | | | group5_short | string | The short value of group 5 | | **Show JSON Response** json result ``` [ { "job_id": 1, "group1_short": "00010", "group2_short": "0", "group3_short": "No", "group4_short": "0", "group5_short": "" } ] ```