--- title: "JobPeriodValues" slug: "safran-project-integration-api-job-period-values" updated: 2024-11-22T08:27:01Z published: 2024-11-22T08:27:01Z canonical: "docs.safran.com/safran-project-integration-api-job-period-values" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # JobPeriodValues ## Job Period Values ### /v1/dru/jobperiodvalues/ The Data Reporting Utility enables users to define aggregation jobs and generate aggregated results. The job definitions and results are stored in your database and can be accessed through this API List Of periods of the aggregated values from a Data Reporting Utility [Job](/v1/docs/jobs). ### Example for calling: http://server/v1/dru/jobperiodvalues?id=2 – retrieves values from the job with id 2 ### Allowed Methods: [GET] API Controller: **dru_jobresult** ### Description: 1. Retrieves periods of the aggregated results of a Job. **Parameters:** | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | id | integer | The ID of the Job | Mandatory | ### Response Fields: | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | start | datetime | Start of the period | | | finish | datetime | End of the period | | **Show JSON Response** json result ``` [ { "start": "2024-01-01T00:00:00", "finish": "2024-06-02T00:00:00" }, { "start": "2024-06-02T00:00:00", "finish": "2024-06-03T00:00:00" }, { "start": "2024-06-16T00:00:00", "finish": "2024-06-17T00:00:00" }, { "start": "2024-06-17T00:00:00", "finish": "2024-06-18T00:00:00" } ] ```