--- title: "Project_Previews" slug: "safran-project-integration-api-project-previews" updated: 2026-01-30T07:39:11Z published: 2026-01-30T07:39:11Z canonical: "docs.safran.com/safran-project-integration-api-project-previews" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Project_Previews ## Project_previews ### /v1/project_previews/ Project_previews Details ### Example for calling: http://server/v1/project_previews http://server/v1/project_preview?owner=safran - retrieves all details where the network owner is safran. ### Allowed Methods: [GET] API Controller: **project_previews** ### Description: In Safran Project 5, Projects and Networks were distinct entities. This call returns a list of the relationships between networks and projects. In Safran Project 7, The Network term is no longer in use. Typically, the Project ID and Network ID are the same. However, this call may still be helpful when referencing data that originated in Safran 5. ### Parameters: | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | owner | string | Owner of the network | Optional | ### Request Fields: none **Response Fields** : | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | project_id | int | Unique project Id | | | project_name | string | Project name | | | network_id | int | Unique network Id | | | network_name | string | Network name | | **Sample JSON Response** json result ``` [ { "project_id": 12, "project_name": "Project - ", "network_id": 1, "network_name": "Project 001" }, { "project_id": 10, "project_name": "Project - ", "network_id": 9, "network_name": "Project 002" } ] ```