--- title: "ProjectScopeConfiguration" slug: "safran-project-integration-api-project-scope-configuration" updated: 2026-01-30T07:39:27Z published: 2026-01-30T07:39:27Z canonical: "docs.safran.com/safran-project-integration-api-project-scope-configuration" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # ProjectScopeConfiguration ## ProjectScopeConfiguration ### /v1/projectscopeconfiguration/{id} Retrieves one or more projects scope configuration details. Regarding relation of network_id and project_id see [project_previews](/v1/docs/project-previews) for more details. ### Example for calling: http://server/v1/projectscopeconfiguration?id=1 - Retrieves details for project having project_id = 1 http://server/v1/projectscopeconfiguration?network_id=2 - Retrieves details for project having net_id = 2 http://server/v1/projectscopeconfiguration?item_guid=87de7975-097a-45b9-aaf8-51793e74cbdf - Retrieves details for network having guid = 87de7975-097a-45b9-aaf8-51793e74cbdf http://server/v1/projectscopeconfiguration?owner=SAFRAN - Retrieves details for project owned by user SAFRAN http://server/v1/projectscopeconfiguration?network_id=2&owner=SAFRAN - Retrieves details for project having net_id = 2 and owned by user SAFRAN http://server/v1/projectscopeconfiguration - Is not permitted. ### Allowed Methods: [GET] API Controller: **ProjectScopeConfiguration** #### Description: Retrieves the project scope configuration details of a project for specified id, or all user owned projects when owner is specified. ![API Methods Scope Config](https://cdn.document360.io/50ded092-9d8c-4eb9-8e6f-51ce28d62ac8/Images/Documentation/API%20Methods%20Scope%20Config.png) ### Request Fields: | Name | Type | Description | Notes | | --- | --- | --- | --- | | id | integer | Id of the project | Optional Returns details for provided project id | | network_id | integer | id of the related network | Optional Returns details for provided network id | | owner | string | Owner of the project | Relates to "SafranWebApiOwnerVerificationDuringApiCalls" in Application Settings | | item_guid | guid | guid of the network | Optional Returns details for provided guid | - When "SafranWebAPIOwnerVerificationDuringApiCalls" is in use the network_id is mandatory. - If ID, network_id and/or guid is passed to the API, all given values will be used. ### Response Fields: | Name | Type | Description | Notes | | --- | --- | --- | --- | | project_id | integer | Unique ID of the project | | | scope_type | string | "csh" or "rsh" or "tsh" | csh - Baseline scope rsh - Current scope tsh - Total scope | | qty_type | string | "planned" or "contract" | | | variation_order | boolean | | | | variation_order_request | boolean | | | | internal_change | boolean | | | | sub_contracted | boolean | | | **Show Response Sample** json result ``` [ { "project_id": 1, "scope_type": "csh", "qty_type": "planned", "variation_order": true, "variation_order_request": false, "internal_change": false, "sub_contracted": false }, { "project_id": 1, "scope_type": "rsh", "qty_type": "planned", "variation_order": true, "variation_order_request": false, "internal_change": false, "sub_contracted": false }, { "project_id": 1, "scope_type": "tsh", "qty_type": "planned", "variation_order": true, "variation_order_request": true, "internal_change": false, "sub_contracted": false } ] ```