--- title: "Resource Set" slug: "safran-project-integration-api-resourceset" updated: 2026-01-30T07:46:10Z published: 2026-01-30T07:46:10Z canonical: "docs.safran.com/safran-project-integration-api-resourceset" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Resource Set ## ResourceSet ### /v1/resourceset/{networkid} List Of Resource Sets ### Example for calling: http://server/v1/resourceset?id=1 - retrieves resource set having id = 1 http://server/v1/resourceset/9 - retrieves resource set assigned to the network having network id = 9 http://server/v1/resourceset?network_id=9 - retrieves resource set assigned to the network having network id = 9 http://server/v1/resourceset?owner=safransa - retrieves resource set owned by safransa http://server/v1/resourceset - retrieves all resources sets ### Allowed Methods: [GET] API Controller: **ResourceSet** ### Description: Lists all resource set for the supplied network_id or other given request fields. ### Request Fields: | Name | Type | Description | Notes | | --- | --- | --- | --- | | id | integer | Id of the resource set | [Optional] Returns all available resource sets if missing | | network_id | integer | Id of the network, related to the resource set | [Optional] Returns all available resource sets if missing | | owner | string | owner of the resource set | Returns all available resource sets if missing, also relates to "[SafranWebApiOwnerVerificationDuringApiCalls](/v1/docs/application-settings#application_settings_SafranWebAPIOwnerVerificationDuringApiCalls)" in "[Application Settings](/v1/docs/application-settings)" | 1. When "[SafranWebApiOwnerVerificationDuringApiCalls](/v1/docs/application-settings#application_settings_SafranWebAPIOwnerVerificationDuringApiCalls)" is in use, one of the Ids is mandatory. 2. When "[SafranWebApiOwnerVerificationDuringApiCalls](/v1/docs/application-settings#application_settings_SafranWebAPIOwnerVerificationDuringApiCalls)" is in use, and using id - all ids must relate to a resource set with the same owner. 3. Combining the ID's in one call is not supported. ### Response Fields: | **Name** | **Type** | **Description** | **Notes** | | -------- | -------- | ---------------------- | --------- | | id | integer | Unique resource_set Id | | | name | string | Resource set name | | | owner | string | Resource set owner | | This is the default topic template. You can write your content here. **Sample JSON Response** ``` [ { "id": 35, "name": "#19665 G08 Safran M and M Level 4 - 35", "owner": "OVL" }, { "id": 9, "name": "Tunnel Project History - 9", "owner": "OVL" }, { "id": 36, "name": "Tunnel Project minutes - 36", "owner": "OVL" }, { "id": 10, "name": "Tunnel Start - 10", "owner": "OVL" } ] ```