--- title: "Version" slug: "safran-project-integration-api-version" updated: 2026-01-30T07:46:27Z published: 2026-01-30T07:46:27Z canonical: "docs.safran.com/safran-project-integration-api-version" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Version ## Version ### /v1/version List the version details of the API. Notice that all API calls are respecting the [Security setting](/v1/docs/security), all exept this call. This is done in order to allow for a mechanisim which can be used to check connection and the availability to the API. ### Example for calling: http://server/v1/version - retrieves the version details of the API ### Allowed Methods: [GET] API Controller: **version** ### Description: List relevant version details of the API and connected database. ### Request Fields: There are no request fields for this API. ### Response Fields: | Name | Type | Description | Notes | | --- | --- | --- | --- | | ApiName | string | Name of the API | | | ApiDescription | string | Description of the API | | | ApiBuildDate | string | Date when the API version was build | | | ApiCompany | string | Company owning the solution | | | ApiCopyright | string | Copyright details | | | ApiDllVersion | [version[]](/v1/docs/version#version-details) | Version details | | | ApiFileVersion | [version[]](/v1/docs/version#version-details) | Version details | | | DatabaseVersion | [version[]](/v1/docs/version#version-details) | Version details | | | DatabaseLevel | integer | | | #### Version Details: | Name | Type | Description | Note | | --- | --- | --- | --- | | Major | integer | Major version number | | | Minor | integer | Minor version number | | | Build | integer | Build version number | | | Revision | integer | | | | MajorRevision | integer | | | | MinorRevision | integer | | | **Sample JSON Response** ``` [ { "ApiName": "Safran.Project.Integration.API", "ApiDescription": "Safran Project Integration API", "ApiCopyright": "Copyright © 2022", "ApiCompany": "Safran Software Solutions AS", "ApiBuildDate": "2022-sep-01", "ApiDllVersion": { "Major": 7, "Minor": 2, "Build": 0, "Revision": 9, "MajorRevision": 0, "MinorRevision": 9 }, "ApiFileVersion": { "Major": 7, "Minor": 2, "Build": 0, "Revision": 9, "MajorRevision": 0, "MinorRevision": 9 }, "DatabaseVersion": { "Major": 21, "Minor": 1, "Build": 10, "Revision": 0, "MajorRevision": 0, "MinorRevision": 0 }, "DatabaseLevel": 103 } ] ```