--- title: "02 - Getting Started" slug: "02-getting-started" updated: 2026-09-28T09:45:01Z published: 2026-09-28T09:45:01Z canonical: "docs.safran.com/02-getting-started" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # 02 - Getting Started # Getting Started Version: V26.0 (Beta) **Back To**: [Index](/v1/docs/00-index-2) --- ## II. GETTING STARTED The Data Migration tool is accessed from the main Safran Risk Manager application from the action dropdown menu (top right-hand menu option). Select the DMUT option and a new tab will open in the browser. **Note: Access to the DMUT tool is controlled. If you cannot see the DMUT option and require access, then contact your site administration.** ![Geting Started 1](https://cdn.document360.io/50ded092-9d8c-4eb9-8e6f-51ce28d62ac8/Images/Documentation/Geting%20Started%201.png) The new browser tab will not require any additional usernames or passwords, as security is handled from within the tool. Our web application maintains a user-friendly interface with easy-to-navigate menus and tabs. These features are designed to give you a smooth and streamlined user experience. --- **Next**: [Scope of this Guide](/v1/docs/03-scope-of-this-guide) **Previous**: [Introduction](/v1/docs/01-introduction) **Back to**: [Index](/v1/docs/00-index-2)