--- title: "04 - Key Interface Elements" slug: "04-key-interface-elements" status: "new" updated: 2026-08-25T13:56:42Z published: 2026-08-25T13:56:42Z canonical: "docs.safran.com/04-key-interface-elements" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # 04 - Key Interface Elements # Key interface elements Version: V26.0 (Beta) **Back To**: [Index](/v1/docs/00-index-2) --- ## IV. KEY INTERFACE ELEMENTS Before starting, familiarize with the visual indicators used during data mapping: - Yellow Border: Indicates a dynamic partial string match found automatically by the system. - Green Border: Indicates a successful match loaded from a saved user configuration. - Red Border: Indicates a validation error or missing required/reference field. --- **Next**: [Features and Functions Introduction](/v1/docs/05-features-and-functions) **Previous**: [Scope of the Guide](/v1/docs/03-scope-of-this-guide) **Back to**: [Index](/v1/docs/00-index-2)