--- title: "Profileset" slug: "safran-project-integration-api-profileset" updated: 2026-01-29T12:23:58Z published: 2026-03-04T11:07:22Z canonical: "docs.safran.com/safran-project-integration-api-profileset" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.safran.com/llms.txt > Use this file to discover all available pages before exploring further. # Profileset ## Profileset ### /v1/profileset Retrieves profileset details. ### Example for calling: http://server/v1/profileset?id=1 - Retrieves profileset having id = 1. http://server/v1/profileset?owner=SAFRANSA - Retrieves profileset owned by SAFRANSA. http://server/v1/profileset?name=MyProfileset - Retrieves profileset with the name MyProfileset. ### Allowed Methods: [GET] API Controller: **Profileset** ### Description: Retrieves the profileset details for specified set or by owner. ### Request Fields: | Name | Type | Description | Notes | | --- | --- | --- | --- | | id | integer | Id of the profileset | [Optional] | | owner | string | Owner of the profileset | Relates to "[SafranWebApiOwnerVerificationDuringApiCalls](/v1/docs/safran-project-integration-api-application-settings)" in Application Settings | | name | string | The name of the profileset | [Optional] | - When "SafranWebAPIOwnerVerificationDuringApiCalls" is in use the id is mandatory. - Specifying name and id, will have the id take priority. ### Response Fields #### profileset | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | id | integer | Unique profileset Id | | | name | string | The profileset name | | | owner | string | The owners of the profileset | | | profile | structure | See [profile](/docs/safran-project-integration-api-profileset#profile) | | #### profile | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | id | integer | Unique profile Id | | | name | string | The profile name | | | profileinterval | structure | see [profileinterval](/docs/safran-project-integration-api-profileset#profileinterval) | | #### profileinterval | **Name** | **Type** | **Description** | **Notes** | | --- | --- | --- | --- | | value_x | double | The x value | | | value_y | double | The y value | | **Sample JSON Response** json result ``` [ { "id": 1, "name": "Default profileset", "owner": "SAFRANSA", "profile": [ { "id": 1, "name": "Default", "profileinterval": [ { "value_x": 100, "value_y": 100 } ] } ] } ] ```