Documentation Index

Fetch the complete documentation index at: https://docs.safran.com/llms.txt

Use this file to discover all available pages before exploring further.

04 - Key Interface Elements

Prev Next

# Key interface elements

Version: V26.0 (Beta)
Back To: Index


IV. KEY INTERFACE ELEMENTS

Before starting, familiarize with the visual indicators used during data mapping:

  • Yellow Border: Indicates a dynamic partial string match found automatically by the system.
  • Green Border: Indicates a successful match loaded from a saved user configuration.
  • Red Border: Indicates a validation error or missing required/reference field.

Next: Features and Functions Introduction
Previous: Scope of the Guide
Back to: Index