Documentation Index

Fetch the complete documentation index at: https://docs.safran.com/llms.txt

Use this file to discover all available pages before exploring further.

Layouts

Prev Next

Layouts

One of the Safran Planner features you will learn to appreciate the level of customising and flexibility, making it possible to adapt to company-wide standards or even personal style of management and presentation layouts. The basic default view is perfect for many Safran Planner users, with a simple and uncluttered barchart containing the most basic information needed. Still, you might prefer more information displayed and more symbols or attributes added to your barchart. Safran Planner allows you to customise and store an unlimited number of layouts. Each layout holds a variety of colours, symbols, field selection, sort, summary, and formatting preferences. Customisable layouts offer complete control over the appearance of on-screen displays and the printed output.

What Are Layouts?

A layout combines all visual elements and characteristics in the Barchart Editor view, the select statements or filters applied to the project, the sort order, and group properties. These elements include the activities, bar configuration visibility, the appearance of relationship, colour settings, grid lines, timeline span, and fields selected in the Activity Columns. Layouts enable you to design the way a project is displayed on screen. You can save a layout and use it later, either with the project for which it was created or with another project. There is always a layout in control of the display. When you change the formatting of any kind, you are changing the current layout.

The screenshot below shows a layout that is saved with the BE Histogram on display:
Planner What are Layouts

Working with Layouts

The appearance of the two parts in the Barchart Editor view, the Column and Bar areas, are always controlled by a layout. When opening the Barchart Editor, Safran Planner provides a basic Default layout. You can change any of its characteristics or add new ones, overwrite the original layout, or create a new layout and add it to a list of available layouts. The layout is a view of your data. You can save your layout specifications and use them again, fine-tune and modify them later, or invent new ones. When selecting layouts, you can specify which layouts to choose from or select defined layouts from other users.

If you switch between layouts, Safran prompts you to save any changes to the current layout. If you do not want to save your latest tailoring to the existing layout but still want to keep this display, save the current layout using the Save As option.

The System Default Layout

The System Default layout for the Barchart Editor includes the Activity Columns and a Bar Area. The Activity Columns show activity ID, descriptions, activity type, start no earlier than dates, early start/finish dates, activity duration, calendar, and planned QTY. The Barchart contains bars for early dates.

Safran Planner also provides a Default layout called DEFAULT, which you can modify to suit your needs. Initially, the DEFAULT layout is identical to the System Default.

The System Default layout with its characteristics is shown below:

Planner Default Layout

Opening an existing layout

Use the quick-access menu to layouts on the toolbar. Select a layout from the drop-down list, and Safran redraws your screen.

SP%20BE%20Layouts%20Existing%20Layout

Changing between layouts is a powerful tool when you want to see your project from different perspectives, pinpointing or highlighting specific areas. If you use a layout specified by another user, choose 'Users' and select one of the options available for Choose Layouts—from all users or project users. You cannot save changes to or delete other users' layouts.

SP%20BE%20Layouts%20Existing%20Layout%20User

A tooltip is available for Layouts and Filters if the layout name is very long.

SP%20BE%20Layouts%20Existing%20Layout%20Long%20Name

Quick access to your last used layouts (Recent layouts)

If you have access to a lot of layouts, you may save time using the 'Recent layout' dropdown list when switching between your favourite layouts:

SP%20BE%20Layouts%20Recent%20Layouts

Revert Layout

SP%20BE%20Layouts%20Quick%20Layout

This option allows you to revert to the original layout before modifying it (unless you have saved it) with the new changes).

This is a new feature from 22.1.00. The workaround in older versions is to select a different layout and then go back to the layout again.

Creating a New Layout from scratch

In the HOME ribbon, click the down arrow in the Layouts section.
Planner Expand Layout Ribbon

It is now possible to keep the Layout window open while working in the Barchart Editor. Press 'Close' or 'X' to close it.

The default listing will contain your layouts. You can view layouts by all users, project users, and report groups. You can also use the Layout selection feature (the blue square in the figure below) to narrow the list by adding a text filter for the layout name.

Planner Layout Window Choose Layout

Planner Layou Selection

Select 'New,' enter a unique name for your layout, Press OK, and then select the layout you created. Now, you can start customising the layout by choosing activity columns, setting colours for symbols, creating new symbols, defining summaries, setting sort criteria, and editing the appearance of the bar area. The New option allows you to start with a layout identical to the initial default layout (System Default) or from a selected layout.

Planner Layout Window New

Planner New Layout from Selected Item or Defaults

Any changes to the activity columns or the presentation in the bar area will be saved to the current selected layout. This also applies to the default layout if that is your desired layout.

To Save a Copy of a Layout

Use 'Save As' to make a copy of an existing Layout. Select a layout from the menu, then click 'Save As' and enter a name for the new layout.

Planner Layout Save As

An unlimited number of layouts may be created and saved, allowing you to create a library of layouts and apply them as needed.

To Rename a Layout

Use the rename button to give your layout a new name.

To Delete a Layout

Select the layout from the drop-down list of available layouts, press the Delete button to delete, and then press OK to confirm deletion.

Planner Layout Delete

Add Comments to a Layout

Since layouts can be used in reports and accessed from the Safran Web Access (SWA) client, you may want to add comments or a description. When using the SWA client, the comments are displayed as descriptions for the layouts.

Planner Layout Comments

Planner Layout Comments Config

Set Layout Attributes

You can use the layout window's Quick Set features to set attributes from the open layout to all layouts selected in the Layout window. If you do not want the Quick Set to update all layouts, you should choose layouts using the quick filter and then press the Quick Set button to specify the attributes to be set.
Planner Layout Quick Sets

Planner Layout Quick Set Config

Exporting a layout

File / Export / Layouts...

Planner Layout Export

Choose which layout(s) you want to export by clicking "include", then choose filename and export destination followed by Export.

Planner Layout Export choice

Importing a layout

File / Import / Layouts...

Find the file location and choose which layout(s) you want to import (if the file contains various layouts). Press save:

Planner Layout Import Choice

Layouts and Summaries

Safran Planner lets you group and view project data in unlimited ways. To define a summary structure, referred to as Group Properties, choose Group Properties in the VIEW ribbon.

SP%20BE%20Layouts%20Summaries

You may also select Group Properties by right-clicking anywhere on the Barchart Editor.

SP%20BE%20Group%20Properties

You can select from any Userfield in any of the 10 group levels. When you add fields to the group properties definition, you will build a virtual structure that is part of your layout into your project. Defining layouts with different group properties is a valuable tool for switching between different views of your project.

Planner Layout Group Properties

For example, you may define one layout that groups your project according to the person responsible, another according to project phases, and a third that groups your project according to discipline or department. When you switch between the views, Safran Planner automatically rearranges activity data and groups in real time, summarising data according to the group definition.

Layouts and Reports

All customisations stored in Layouts can be included in your weekly, bi-weekly, and monthly reporting. Layouts can also be included as reports in report groups and report packages.