Documentation Index

Fetch the complete documentation index at: https://docs.safran.com/llms.txt

Use this file to discover all available pages before exploring further.

Resource Set

Prev Next

ResourceSet

/v1/resourceset/{networkid}

List Of Resource Sets

Example for calling:

http://server/v1/resourceset?id=1 - retrieves resource set having id = 1
http://server/v1/resourceset/9 - retrieves resource set assigned to the network having network id = 9
http://server/v1/resourceset?network_id=9 - retrieves resource set assigned to the network having network id = 9
http://server/v1/resourceset?owner=safransa - retrieves resource set owned by safransa
http://server/v1/resourceset - retrieves all resources sets

Allowed Methods:

[GET]
API Controller: ResourceSet

Description:

Lists all resource set for the supplied network_id or other given request fields.

Request Fields:

Name Type Description Notes
id integer Id of the resource set [Optional] Returns all available resource sets if missing
network_id integer Id of the network, related to the resource set [Optional] Returns all available resource sets if missing
owner string owner of the resource set Returns all available resource sets if missing, also relates to "SafranWebApiOwnerVerificationDuringApiCalls" in "Application Settings"
  1. When "SafranWebApiOwnerVerificationDuringApiCalls" is in use, one of the Ids is mandatory.
  2. When "SafranWebApiOwnerVerificationDuringApiCalls" is in use, and using id - all ids must relate to a resource set with the same owner.
  3. Combining the ID's in one call is not supported.

Response Fields:

| **Name** | **Type** | **Description** | **Notes** | | -------- | -------- | ---------------------- | --------- | | id | integer | Unique resource_set Id | | | name | string | Resource set name | | | owner | string | Resource set owner | |

This is the default topic template. You can write your content here.

Sample JSON Response
[
    {
        "id": 35,
        "name": "#19665 G08 Safran M and M Level 4 - 35",
        "owner": "OVL"
    },
    {
        "id": 9,
        "name": "Tunnel Project History - 9",
        "owner": "OVL"
    },
    {
        "id": 36,
        "name": "Tunnel Project minutes - 36",
        "owner": "OVL"
    },
    {
        "id": 10,
        "name": "Tunnel Start - 10",
        "owner": "OVL"
    }
]