Documentation Index

Fetch the complete documentation index at: https://docs.safran.com/llms.txt

Use this file to discover all available pages before exploring further.

Test

Prev Next

Test

/v1/test

Used to confirm communication and configuration of the Safran API installation.

Notice that this API call is respecting the Security setting. In case you wish to test communication without the security setting use the Version endpoint.

Example for calling:

http://server/v1/test

Allowed Methods:

[GET]
API Controller: test