Codeset Configuration
/v1/codesets/{id}
Codeset Configuration
Example for calling:
http://server/v1/codesets/9 - retrieves codeset related to network with network Id = 9
http://server/v1/codesets?id=1 - retrieves codeset having Id = 1
http://server/v1/codesets?network_id=9 - retrieves codeset related to network with network id = 9
http://server/v1/codesets?network_id=9&meta_field_select=DLF - retrieves codeset related to network with network id = 9 limited to date, flag and text fields
http://server/v1/codesets?network_id=9&meta_field_select=D,L,F - retrieves codeset related to network with network id = 9 limited to date, flag and text fields
http://server/v1/codesets?network_id=9&meta_field_select=R1,R2,D - retrieves codeset related to network with network id = 9 limited to R field 1 and 2 and all date fields
http://server/v1/codesets - retrieves all codesets
Allowed Methods:
[GET]
API Controller: Codeset
Description:
Retrieves the configuration detail for specified codeset or all codesets if no ID is specified. Only defined userfields are included.
Codeset and master codeset
A definition of a "codeset" could be connected to another "codeset", here referred to as a "master codeset". When requesting details for a "code set" connected to a "master codeset", the "reference value" will be retrieved from the "master codeset". The "reference fields" values will be retrieved from the "codeset". When a "codeset" is not connected to other codesets, all values will be retrieved from the "codeset" it selves.
Using Reference Fields in Safran Solution
In the Safran Solution (such as Safran Project), "Reference Fields" can reference not only their local set or a master set but also other database tables. This is achieved through an "Advanced SQL" configuration within the Safran Solution.
When using the API, it expects the SQL query to return three columns with the following data types:
- Integer
- String
- String
If your columns are of different types, you need to cast them within the SQL command to match the expected types.
Example for MS SQL:
SELECT seq, CONVERT(nvarchar(50), wpn) AS wpn, an
FROM activities
WHERE net_id = 2 AND seq = 3;
Example for Oracle:
SELECT SEQ, TO_CHAR(WPN) AS WPN, an
FROM ACTIVITIES
WHERE NET_ID = 2 AND SEQ = 3;
In this example:
seq
is an integer.wpn
is converted to a string usingCONVERT(nvarchar(50), wpn)
.an
is a string.
Ensure that your SQL query aligns with these requirements to avoid any issues.
Parameters:
Name | Type | Description | Notes |
---|---|---|---|
id | integer | Codeset ID | |
network_id | integer | Network ID | Mandatory when "SafranWebApiOwnerVerificationDuringApiCalls" is in use. |
owner | string | Owner of the code set | Relates to "SafranWebApiOwnerVerificationDuringApiCalls" in Application Settings |
meta_field_select | string | List of fields to include in the response, see Response Fields | If empty or missing, all fields will be included. D = All date_fields F = All text_fields L = All flag_fields N = All decimal_fields O = All outline_codes R = All reference_fields U = All duration_fields 0 = Do not include any of the above elements. Dx = Date field number x Fx = Text field number x Lx = Flag field number x Nx = Decimal field number x Ox = Outline code number x Rx = Reference field number x Ux = Duration field number x ExcludeValues = Suppress details as "outline_codes.outline_values" and "reference_fields.reference_values" |
- Combining id with network_id is not supported
- When "SafranWebApiOwnerVerificationDuringApiCalls" is used, the CodeSet retrieved can only be linked to projects owned by the same owner as the CodeSet. Should the CodeSet be linked to other projets, owned by others, the API will return failure. Unless meta_field_select=0.
- When meta_field_select=0 and the "SafranWebApiOwnerVerificationDuringApiCalls" are in use, the owner is mandatory, but neither of the IDs is.
- When specifying meta_field_select and leaving out some fields, the JSON will still contain the fields left out. The element for the fields left out will be empty.
- When specifying meta_field_select with "ExcludeValues", the "outline_code" will contain empty "outline_values[]" and the "reference_field" will contain empty "reference_value[]" elements.
- When specifying meta_field_select with the combination of "ExcludeValues" and "0" as in "0, ExcludeValues" makes no sense and will be responded with "Bad Request".
Response Fields:
Name | Type | Description | Notes |
---|---|---|---|
id | integer | Unique CodeSet Id | |
name | string | Project name | |
owner | string | Owner (Username) | |
reference_fields | reference_field[] | Collection of defined reference_field objects | |
text_fields | generic_field[] | Collection of defined generic_field objects of type text | |
date_fields | generic_field[] | Collection of defined generic_field objects of type date | |
flag_fields | generic_field[] | Collection of defined generic_field objects of type flag | |
number_fields | generic_field[] | Collection of defined generic_field objects of type number | These are obsolete since 7.1.00, 30 June 2016. |
decimal_fields | generic_field[] | Collection of defined generic_field objects of type decimal | |
duration_fields | generic_field[] | Collection of defined generic_field objects of type duration | |
outline_codes | generic_field[] | Collection of defined outline_code objects |
Reference Fields:
Name | Type | Description | Notes |
---|---|---|---|
field_nr | integer | Reference field number | |
label | string | Field label of this field | |
reference_values | reference_value[] | Collection of defined reference_value objects | |
visible | boolean | Tell if field is visible, values true or false | |
enabled | boolean | Tell if field is enabled, values true or false | |
inherit_label | boolean | Tell if (true) the label is inherited from the master set. It will be shown in Safran UI. Else (false) the label of this field will shown. | The default value is false |
inherit_field_nr | integer | If the set is inherited, this tells which field it is inherited from. | Which field number in the master set. |
inherit_id | integer | If the set is inherited, this tells which set it is inherited from | Which ID in the master set. |
inherit_sql | string | This will contain the Standard Safran SQL, or the Advanced SQL, where the field is inherited from. |
Reference Value:
Name | Type | Description |
---|---|---|
_short | string | Reference value short identifier |
description | string | Reference value description |
sort_field | integer | Sort order of the reference_value[] |
Example for reference fields and reference_values
Generic Field:
Name | Type | Description | Notes |
---|---|---|---|
field_nr | integer | Reference field number | |
label | string | This fields' label | |
visible | boolean | Tell if field is visible, values true or false | |
enabled | boolean | Tell if field is enabled, values true or false | |
inherit_label | boolean | Tell if (true) the label is inherited from the master set. It will be shown in Safran UI. Else (false), the label of this field will shown. | The default value is false |
inherit_field_nr | integer | If the set is inherited, this tells which field it is inherited from. | Which field number in the master set. |
inherit_id | integer | If the set is inherited, this tells which set it is inherited from | Which ID in the master set. |
This generic field structure is present where generic user fields have been defined in the codeset (date_fields, decimal_fields, duration_fields, flag_fields, number_fields, or text_fields).
number fields are no longer used in Safran 7. Decimal fields are used instead.
outline_code:
Name | Type | Description | Notes |
---|---|---|---|
field_nr | integer | Reference field number | |
label | string | Field label | |
oc_levels | integer | Number of maximum levels of depth in outline | |
levels | level[] | Collection of defined outline_code levels | |
outline_values | outline_value[] | Collection of defined outline_code values | |
visible | boolean | Tell if field is visible, values true or false | |
enabled | boolean | Tell if field is enabled, values true or false | |
inherit_label | boolean | Tell if label is inherited from the master set. |
Level:
Name | Type | Description |
---|---|---|
level_nr | int | outline level number |
label | string | outline level label |
char_type | integer | Character type of level’s short value. Possible types: Any character, Uppercase, Lowercase, Numeric |
field_length | integer | Length of level’s short value. Possible lengths: Any, 1, 2, 3, 4, 5 |
divider_char | string | Character separating level from next level when displaying full path. Possible values: '.' ';' ':' '*' '\' '+' '-' |
Outline_Value:
Name | Type | Description | Notes |
---|---|---|---|
description | string | outline value description | |
_short | string | outline value code | |
seq | integer | outline value sequence value | |
parent_seq | integer | Refers to a seq which acts as a parent for this outline value. 0 means no parent. | |
level | integer | Level of the item in the hierarchy list. Level = 1 means root level. | |
delimiter_char | char | Delimiter character separates the short elements in a string of full path items. | This is used to communicate between the caller and API. This cannot be set to the same as "divider_char" as found in "Level". The API will use '§' as delimiter_char in GET calls.. |
Example for outline Code fields
Sample JSON Response
json result
[
{
"date_fields": [
],
"flag_fields": [
],
"number_fields": [
],
"decimal_fields": [
],
"duration_fields": [
],
"outline_codes": [
],
"id": 1,
"name": "Safran Software Solutions AS - 1",
"owner": "SAFRANSA",
"reference_fields": [
{
"reference_values": [
{
"description": "Procurement (Master)",
"_short": "PO (M)"
}
],
"field_nr": 1,
"label": "API Test.R1 (Local)",
"inherit_label": false,
"visible": true,
"enabled": true,
"inherit_field_nr": 44,
"inherit_id": 141,
"inherit_sql": "SELECT code, short, description FROM codeset WHERE rfield_nr = 44 and config_id = 141"
}
],
"text_fields": [
{
"field_nr": 1,
"label": "ABC Activity Code",
"visible": true,
"enabled": true
"inherit_field_nr": 1,
"inherit_id": 141,
},
{
"field_nr": 2,
"label": "DEF no",
"visible": true,
"enabled": true
}
]
}
]