02 - Getting Started

Prev Next

# Getting Started

Version: V26.0 (Beta)
Back To: Index


II. GETTING STARTED

The Data Migration tool is accessed from the main Safran Risk Manager application from the action dropdown menu (top right-hand menu option). Select the DMUT option and a new tab will open in the browser.
Note: Access to the DMUT tool is controlled. If you cannot see the DMUT option and require access, then contact your site administration.

Geting Started 1

The new browser tab will not require any additional usernames or passwords, as security is handled from within the tool.

Our web application maintains a user-friendly interface with easy-to-navigate menus and tabs. These features are designed to give you a smooth and streamlined user experience.


Next: Scope of this Guide
Previous: Introduction
Back to: Index