CalendarSet
/v1/calendarset
Example for calling:
http://server/v1/CalendarSet?id=2094 - retrieves all Calendars from a calendar set with CalendarSet id 2094
http://server/v1/CalendarSet?network_id=94 - retrieves Calendars from a calendar set related to a network with network ID 94
http://server/v1/CalendarSet?network_id=94&meta_field_select=CN - retrieves Calendars from a calendar set related to a network with network id 94, including calendars and non-working period details
http://server/v1/CalendarSet?network_id=94&meta_field_select=0 - retrieves Calendars from a calendar set related to a network with network id 94, excluding calendars and non-working period details
http://server/v1/CalendarSet?meta_field_select=0&owner=safran - retrieves all Calendars from a calendar set where the owner is safran, excluding calendars and non-working period details
The calendar set id is found in the Project Response Fields as "cal_id".
Allowed Methods:
[GET]
API Controller: CalendarSet
Description:
Lists Calendar set for the supplied calendar set id.
Parameters:
Name | Type | Description | Notes |
---|---|---|---|
id | integer | Calendar Set ID | |
network_id | integer | Network ID | Mandatory when "SafranWebApiOwnerVerificationDuringApiCalls" is in use |
owner | string | Owner of the calendar set | Relates to "SafranWebApiOwnerVerificationDuringApiCalls" in Application Settings |
meta_field_select | string | List of fields to include in the response, see Response Fields | Option to decide whether the Calendars and NoneWorkingPeriods elements are to be included in the response fields. If empty or missing, all fields will be included. 0 = Do not include Calendars and NoneWorkingPeriods elements C = Include Calendars but not NoneWorkingPeriods elements N = Include NoneWorkingPeriods, this will also force inclusion of Calendars elements. |
- Combining id with network_id is not supported.
- When "SafranWebApiOwnerVerificationDuringApiCalls" is used, the CalendarSet retrieved can only be linked to projects owned by the same owner as the Calendar Set. Should the CalendarSet be linked to other projects owned by others, the API will return failure.
- When meta_field_select=0 and the "SafranWebApiOwnerVerificationDuringApiCalls" are in use, the owner is mandatory, but either of the IDs is not.
Response Fields
CalendarSet
Name | Type | Description |
---|---|---|
cal_id | integer | Calendar set ID |
cal_name | string | Calendar set name |
cal_start | datetime | Calenddar set start date |
cal_finish | datetime | Calendar set finish date |
owner | string | Owner (Username) |
cal_type | string | d=days, h=hours, m=minutes |
Calendars | calendar[] | Collection of defined calendar objects |
Calendar
Name | Type | Description |
---|---|---|
Hours | double | Work hours per day |
Description | string | Description |
Cal_id | integer | Calenddar set ID |
Wpn | integer | Calendar number |
Units_pr_week | double | Planned work days per week (used for conversion to days when duration is given by weeks) |
NonWorkingPeriods | NonWorkingPeriod[] | Collection of defined NonWorkingPeriod objects |
NonWorkingPeriod
Name | Type | Description |
---|---|---|
Cal_id | int | Calenddar set ID |
Wpn | int | Calendar number |
Rest_from | datetime | Rest from date/time |
Rest_until | datetime | Rest until date/time |
Day_of_week | short | Rest day of Week (Available values are 1,2,3,4,5,6,7,8,9) |
Rest_from_hrs | short | Rest from hours |
Rest_until_hrs | short | Rest until hours |
Seq | int | Unique sequence number |
Rest_from_min | short | Rest from minute |
Rest_until_min | short | Rest until minute |
Sample Calendar set shown in Safran Project:
Calendar Db model overview:
Calendar API class structure overview:
Sample JSON
[
{
"Cal_id": 2094,
"Cal_name": "Sample Calendar Set",
"Cal_start": "2015-01-01T00:00:00",
"Cal_finish": "2036-12-31T00:00:00",
"Owner": "SA",
"Cal_type": "d",
"Calendars": [
{
"Hours": 7.5,
"Description": "Calendar 0",
"Cal_id": 2094,
"Wpn": 0,
"Units_pr_week": 7,
"NonWorkingPeriods": [
{
"Cal_id": 2094,
"Wpn": 0,
"Day_of_week": 6,
"Rest_from_hrs": 0,
"Rest_until_hrs": 0,
"Seq": 712015,
"Rest_from_min": 0,
"Rest_until_min": 0
},
{
"Cal_id": 2094,
"Wpn": 0,
"Day_of_week": 7,
"Rest_from_hrs": 0,
"Rest_until_hrs": 0,
"Seq": 712016,
"Rest_from_min": 0,
"Rest_until_min": 0
}
]
}
]
}
]