Projects## Projects
/v1/projects/{id}
Retrieves project details.
Regarding the relation of network_id and project_id, see project_previews for more details.
Example for calling:
http://server/v1/projects?id=1 - Retrieves project having project_id = 1.
http://server/v1/projects?network_id=2 - Retrieves project having network_id (net_id) = 2.
http://server/v1/projects/2 - Retrieves project having network_id (net_id) = 2.
http://server/v1/projects?owner=SAFRANSA - Retrieves project having SAFRANSA as the owner.
http://server/v1/projects?meta_updated_after=2022-01-04T07:28:00.000 - Retrieves project which has been updated after given UTC time.
http://server/v1/projects?Meta_updated_prior=2022-01-04T07:28:00.000 - Retrieves project which has been updated prior given UTC time.
http://server/v1/projects - Retrieves all projects.
Allowed Methods:
[GET]
API Controller: Projects
Description:
Retrieves the project details for specified project_id, or all projects if no id is specified.
Request Fields:
| Name | Type | Description | Notes |
|---|---|---|---|
| id | integer | Id of the project | [Optional] Returns all projects if none specified |
| network_id | integer | id of the related network | [Optional] Returns all projects if none specified |
| owner | string | Owner of the project | Relates to "SafranWebApiOwnerVerificationDuringApiCalls" in Application Settings |
| item_guid | guid | guid of the project | [Optional] Returns all projects if none specified |
| meta_updated_prior | string | Datetime in ISO-8601 format, using UTC time zone | [Optional] Find projects which was updated prior given time stamp. |
| meta_updated_after | string | Datetime in ISO-8601 format, using UTC time zone | [Optional] Find projects which was updated after given time stamp. |
- When "SafranWebAPIOwnerVerificationDuringApiCalls" is in use, one of id or network_id is mandatory.
- Specifying owner and network id, will have the network id take priority.
Response Fields
| Name | Type | Description | Notes |
|---|---|---|---|
| project_id | integer | Unique project Id | |
| project_name | string | Project name | |
| project_title | string | Unique network Id | |
| main_network | integer | Network name | |
| project_start | datetime | Project start date | |
| project_end | datetime | Project end date | |
| project_client | string | Project client name (for report titles) | |
| logo_bmp | string | path to company project logo (for reports) | |
| client_bmp | string | path to client logo (for reports) | |
| owner | string | Owners User Id | |
| cut_off_dow | integer | Specifies day of week to be used for cut-offs | |
| contractor | string | Contractor | |
| freetext1 | string | User field – project text entry (for reports) | |
| freetext2 | string | User field – project text entry (for reports) | |
| freetext3 | string | User field – project text entry (for reports) | |
| freetext4 | string | User field – project text entry (for reports) | |
| mr_def_field | string | Possible future use | |
| mr_def_value | integer | Possible future use | |
| ub_def_field | string | Possible future use | |
| ub_def_value | integer | Possible future use | |
| network_id | integer | Network Id | |
| network_name | string | Network name | |
| description | string | Network description | |
| ana_date | datetime | Last analyzed date | |
| ana_tnow | datetime | Time Now for last analysis | |
| user_id | integer | Owner User Id | |
| na_date | datetime | Analysis invalidated date | |
| user_name | string | Owner user name | |
| cal_id | integer | Calendar set Id | |
| profileset | integer | Profile set Id | |
| codeset | integer | Codeset Id | |
| derived_from | integer | Source network if network is a summary network. | |
| calc_id | integer | Rule set Id | |
| save_resource_flag | integer | Flag which tells if resource analysis results shall be saved to database | |
| lock_scope | integer | Flag for preventing updates to scope | |
| auto_sum_scope | integer | Flag for auto sum of qty from resources to the activity fields tsh, rsh and csh | |
| resource_set | integer | Resource set related to the network | |
| symbol_set | integer | Symbol set related to the network | |
| os_scope | integer | Determines the scope for the On schedule activities to be calculated against | |
| disable_split_targets | integer | Disable/enable flag for split targets | |
| gsid | integer | Global set | |
| prog_handling_method | integer | Set mark for progress drop during import | |
| rate_type | integer | Rate type (simple/complex rates) | |
| rate_set | integer | Rate set for complex rates | |
| enterprisefield | enterprisefield | Enterprise Fields for the project | |
| subproject | subproject | Subproject details | |
| item_guid | guid | GUID of the project | |
| lastupdatedutc | datetime | Date and time when project was updated | Time is in Coordinated Universal Time |
| lock_resource_option | integer | Option to Lock Resource Data | See version dependency below |
| lock_resource_option_when | integer | When to Lock Resource Data | See version dependency below |
In connection with Safran Project 5 and Safran Project 7, both the “project_name” and “network_name” will be the same. Likewise for “project_title” and “network_description”
Pre 25.1.00 version
- 0 = Never
- 1 = Lock Quantities, Unit Rate and Cost
- 2 = Lock Quantities, Unit Rate, Cost Lag, Duration, Profile, Calendar and VO NUMBER
From 25.1.00 version
- 0 = Do not Lock Duration, Lag, Profile, Calendar and Vo Numer
- 1 = Do Lock Duration, Lag, Profile, Calendar and Vo Numer
Pre 25.1.00 version
- 0 = When lock_resource_opt = 0
- 1 = When Baseline is set
- 2 = When baseline or status is set
From 25.1.00 version
- 0 = Never
- 1 = When baseline is set, Lock all Resource Data
- 2 = When baseline and Status is set
- 3 = When Baseline is set, Lock only Resource Data part of the Baseline scope
enterprisefield
| Name | Type | Description | Notes |
|---|---|---|---|
| euf_text(n) | string | Name of the field, also indicate field type | (n) indicates the field number |
| value | string | The value of the field | |
| label | string | Label of the field as shown on screen |
| Name | Type | Description | Notes |
|---|---|---|---|
| euf_date(n) | string | Name of the field, also indicate field type | (n) indicates the field number |
| value | date | The value of the field | |
| label | string | Label of the field as shown on screen |
| Name | Type | Description | Notes |
|---|---|---|---|
| euf_flag(n) | string | Name of the field, also indicate field type | (n) indicates the field number |
| value | boolean | The value of the field | |
| label | string | Label of the field as shown on screen |
| Name | Type | Description | Notes |
|---|---|---|---|
| euf_ref(n) | string | Name of the field, also indicate field type | (n) indicates the field number |
| value | structure | The value of the field. "short" and "description" | |
| label | string | Label of the field as shown on screen |
subproject
| Name | Type | Description | Notes |
|---|---|---|---|
| id | integer | The id of the subproject | |
| name | string | The name of the subproject | |
| owner | string | The owner of the subproject | |
| hasactivities | boolean | Tell if the subproject has any activities | true = Yes the subproject has activities false = no there are no activities for the subproject |
Sample JSON Response
json result
[
{
"project_id":12,
"project_name":"Project 001",
"project_title":"Project 001",
"main_network":1,
"project_start":"2020-01-01T00:00:00",
"project_end":"2020-12-31T00:00:00",
"project_client":"",
"logo_bmp":"",
"client_bmp":"",
"owner":"SAFRANSA",
"cut_off_dow":1,
"contractor":"",
"freetext1":"",
"freetext2":"",
"freetext3":"",
"freetext4":"",
"mr_def_field":"",
"ub_def_field":"",
"network_id":1,
"network_name":"Project 001",
"description":"Project 001",
"ana_date":"2020-04-06T13:45:24.76",
"ana_tnow":"2020-03-19T00:00:00",
"user_name":"SAFRANSA",
"cal_id":1,
"profileset":1,
"codeset":1,
"calc_id":0,
"lock_scope":0,
"auto_sum_scope":0,
"resource_set":1,
"symbol_set":1,
"os_scope":1,
"disable_split_targets":0,
"gsid":0,
"prog_handling_method":0,
"rate_type":1,
"rate_set":0,
"ana_off":0,
"stretch":0,
"longest_path":0,
"float_opt":0,
"dependencies":0,
"progress":0,
"save_ana_flag":1,
"sch_opt":3,
"sch_overload_opt":0,
"sch_filter":"",
"sch_sort":"12\t1\t16\t1\t2\t0",
"is_template":0,
"status_method":1,
"enterprisefield":{
"euf_text4":{
"value":"Dexter Steele",
"label":"Responsible Planner"
},
"euf_flag3":{
"value":true,
"label":"Opticom"
},
"euf_ref1":{
"value":{
"description":"Active",
"_short":"A"
},
"label":"Project Status"
},
"euf_ref2":{
"value":{
"description":"",
"_short":"Best"
},
"label":"Enterpries Field 34592"
}
},
"subproject":[
{
"id":107,
"name":"SUB_BETONG",
"description":"Betongprosjekter",
"owner":"SAFRANSA",
"hasactivities":true
}
],
"item_guid":"7bf1cecc-ef7a-4605-bbf7-745092b740f0",
"lastupdatedutc":"2020-04-06T11:45:25.17"
}
]